Automotive Manual PDF

RSS Feed

The Resources for Automotive

94-95 Ford Mustang 5.0L PowerAid Throttle Body Spacer Installation Instructions

May 5th, 2009 · No Comments

1. DISCONNECT NEGATIVE (-) BATTERY CABLE.
2. Remove air cleaner assembly.
3. Remove (2) 8mm bolts from throttle linkage bracket and save. (Ref. D)
4. Remove (4) bolts from the throttle body. (Ref. C)
5. Install the power plate using both gaskets. (Ref. A)
A. Place one gasket between the throttle body and power plate.
B. Place second gasket between the power plate and intake manifold.
6. Install (4) 5/16-18” x 2 1/4” bolts and (4) 5/16” washers. (Ref. C)
7. Install (2) throttle linkage plates using (2) 8mm x 16 flat head screws. (Ref. D)
8. Install throttle linkage bracket using (2) saved 8mm bolts.
9. Inspect & Test throttle linkage for full Open & Closed travel before driving. Some cruise or kickdown cables may require adjustment. Please refer to your vehicles service manual for proper adjusting.
10. Reinstall air cleaner assembly using Step 2 as an example.
11. Reconnect battery cable. Enjoy!

Get pdf 94-95 Ford Mustang 5.0L PowerAid Throttle Body Spacer Installation Instructions

Related Entries


Related Tags: , , , , , , , , , , , , , , ,


Related Keyword: 94 mustang gt pcv diagram, how to install a throttle body spacer on a 94 Ford mustang GT, pcv valve diagram 1996 ford mustang v6 3 8 convertible, schematic front cover 95 ford f150 5 0l

0 comments for this entry ↓

  • There are no comments yet for this entry.

You must log in to post a comment.