Position truck on a flat surface and lift vehicle by the frame so that the front wheels are off the ground. Use a minimum 3 ton jack stands and place under frame for safety or a (2) two post lift if available. Make sure that the emergency brake is on and the rear wheels are blocked to prevent a rollout.
(more…)
2009 Honda Pilot FWD/4WD ReadyLift Part# 69-8010 Installation Instructions
November 8th, 2009 · No Comments
2004-2009 Chevrolet Colorado & GMC Canyon ReadyLift Installation Instructions
September 1st, 2009 · No Comments
Position truck on a flat surface and lift vehicle by the frame so that the front wheels are off the ground. Use minimum 3 ton jack stands and place under frame for safety or a (2) two post lift if available. Make sure that the emergency brake is on and the rear wheels are blocked to prevent a rollout. Remove the front wheels. Unclip the ABS line from the upper control arm.
Unbolt the 13mm ABS line retaining bracket nut.
Unbolt the 21mm tie rod end nut.
Separate the tie rod end from the steering knuckle.
(more…)