Steps 1 through 6 will require two or more people.
1. Cut and remove the straps. Carefully slide the unit carton off the shipping pallet. Remove the top of the shipping carton.
2. Remove the carton by sliding the carton over top of the unit.
3. Remove foam packing from around the sides of the unit.
4. Lean the Sun Machine 450 so that half of the foam base can be removed.
5. Lean the Sun Machine 450 so that other half of the foam base can be removed.
(more…)