Automotive Manual PDF

RSS Feed

The Resources for Automotive

TracVan Double Installation Manual

October 15th, 2009 · No Comments

TracVan installation is straightforward, and should take you under 20 minutes to complete. You’ll attach the Crossbars to the Corner Brackets, then attach this assembly to the Gutter Rails of your van.
1. Verify that you have received the correct parts using the attached Assembly Drawing and Packing Checklist.
2. Fit the Rubber Strip on the lower edge of each Corner Bracket.
Do not install strip:
• On 2000+ Ford 150 Econoline vans.
• If using the Gutter Spans
3. Insert 2 (5/16” x 1 3/4 ” long) Socket Head Cap Screws through the Lock Washers and then into the holes in each Corner Bracket Tab.
(more…)

[Read more →]

MSD 6 Series Installation Instructions

May 7th, 2009 · No Comments

THEORY OF 6 SERIES IGNITION
CAPACITIVE DISCHARGE
The MSD 6 Series Ignitions feature a capacitive discharge ignition design. The majority of stock ignition systems are inductive ignitions. In an inductive ignition, the coil must store and step up the voltage to maximum strength in between each firing. At higher rpm, since there is less time to charge the coil to full capacity, the voltage falls short of reaching maximum energy which results in a loss of power or top end miss. The MSD Ignition features a capacitor which is quickly charged (within one millisecond) with 460 - 480 volts and stores it until the ignition is triggered. With the CD design, the voltage sent to the coil is always at full power even at high rpm.
(more…)

[Read more →]