STEP 1: REMOVE PLYWOOD & INVENTORY CONTENTS
Remove the top cover from the canister box and set it aside for later installation.
Remove the canister from the box. Using the 3/8” wrench or socket remove the 2 bolts holding the plywood on the ends of the canister. Use Side Cut Pliers to cut handle retaining straps. DISCARD PLYWOOD PACKAGING AND BOLTS!
Perform a quick inventory to insure all parts are there. Be sure to check inside the small cardboard box for parts.
(more…)
JackRabbit Honda Ridgeline Instructions
November 8th, 2009 · No Comments
2006-Current Honda Ridgeline Installation Guide
October 31st, 2009 · No Comments
Step 1: Install Bulkhead Adapter
A. Remove the forward upper Tie Down Brackets.
B. Remove the two (2) upper Bedrail bolts per side.
C. Remove the three (3) upper Bulkhead bolts.
Step 2: Installing Mounting Flanges on Bedrails and Bulkhead
Note: Notice that two sizes of metric bolts have been provided. The four (4) large 8mm x 40mm bolts are to be used in the forward positions of the Track Mounting Flanges where the tiedown brackets were removed. The seven (7) smaller 6mm x 40mm bolts are to be used in all the other locations.
(more…)